Saturday, September 25, 2010

dRa BeAuTiFiCaTioN dAy




This week we had our first ever “DRA Beautification Day” hosted by Kelby, our Operations and Maintenance Director.  This event was Ranch-wide and included students and staff.  Work started right after breakfast and lasted until about 9am.  The students were split into three groups: Girls’ campus, Lava Falls, and Stone Ridge.  The girls were assigned Red Camp, the Lava Falls boys reported to the Orchard, and the Stone Ridge boys were assigned the Main Entrance.  Students and staff worked alongside one another in a group effort to improve the appearance of our home away from home.  One of the Stone Ridge boys said, “We were definitely sweating by the end, but it was nice that our teachers and staff were working and sweating with us.”  A good time was had by all, even though work was involved.  In the future, beautification days will take place on the first Wednesday of each month. 



No comments:

Post a Comment